首页> 外文期刊>European Journal of Operational Research >Multi-mode resource-constrained project scheduling problem with generalized precedence relations
【24h】

Multi-mode resource-constrained project scheduling problem with generalized precedence relations

机译:具有广义优先关系的多模式资源受限项目调度问题

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper, we tackle the challenging problem of scheduling activities to minimize the project duration, in which the activities (a) are subject to generalized precedence relations, (b) require units of multiple renewable, non-renewable and doubly constrained resources for which a limited availability is imposed, and (c) can be performed in one of several different ways, reflected in multiple activity scenarios or modes. These multiple modes give rise to several kinds of tradeoffs (time/resource, time/cost and resource/resource trade-offs) which allow for a more efficient allocation and use of resources. We present a local search-based solution methodology which is able to handle many real-life project scheduling characteristics such as time-varying resource requirements and availabilities, activity ready times, due dates and deadlines, activity overlaps, activity start time constraints and other types of temporal constraints.
机译:在本文中,我们解决了安排活动以最大程度地缩短项目工期的难题,其中活动(a)受广义优先关系约束,(b)需要多个可再生,不可再生和双重约束资源的单位,施加了有限的可用性,并且(c)可以通过多种活动方案或模式中反映的几种不同方式之一执行。这些多种模式引起多种折衷(时间/资源,时间/成本和资源/资源折衷),从而可以更有效地分配和使用资源。我们提供了一种基于本地搜索的解决方案方法论,该方法论能够处理许多实际的项目调度特征,例如时变的资源需求和可用性,活动准备时间,到期日期和截止日期,活动重叠,活动开始时间限制和其他类型时间限制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号