StatoilHydro started production from the Tune South satellite well on 18 July. The satellite is tied back to the Oseberg field centre via the Tune subsea template. Output from Tune South is expected to be 1,4 million m~3/a."The field utilises free capacity in the existing infrastructure of the Oseberg area. That makes maximum use of the resources in the area," says Torstein Hole, senior vice president of the operations west business cluster in StatoilHydro.
展开▼