首页> 外文期刊>Engineering Geology >Field investigation into the biodegradation of TCE and BTEX at a former metal plating works
【24h】

Field investigation into the biodegradation of TCE and BTEX at a former metal plating works

机译:在原先的金属电镀厂对三氯乙烯和苯并二恶英进行生物降解的现场调查

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The paper is based on a recent programme of groundwater monitoring at an industrial site in west London. Redevelopment of the site in 1997 revealed high levels of soil and groundwater pollution by hydrocarbon fuels, trichloroethylene (TCE) and soluble metal salts (e.g. free cyanide, chromium VI and nickel). The pollution originated from a previous metal plating and galvanising works at the site. As pact of the redevelopment works, the owners undertook limited excavation works and groundwater extraction to remove the pollutant. However, groundwater sampling has continued to show high levels of pollution. Following discussion with the environment regulator in late 1998, a groundwater monitoring programme was agreed to investigate the potential for co-degradation of the petroleum fuel and TCE. Groundwater samples have been taken from six existing boreholes (1C to 6C). The location of the monitoring boreholes relates to past pollution spillages and the layout of the new factory building. Chemical analyses of groundwater samples show elevated aqueous concentrations of chloroethenes with a classical reduction pathway for trichloroethylene (TCE) leading to an accumulation of vinyl chloride.
机译:该论文基于伦敦西部工业现场的最新地下水监测计划。 1997年对该场地的重新开发表明,碳氢化合物燃料,三氯乙烯(TCE)和可溶性金属盐(例如游离氰化物,六价铬和镍)对土壤和地下水的污染程度很高。污染源于该地点以前的电镀和镀锌工程。作为重建工程的契约,业主进行了有限的挖掘工程和地下水抽取以去除污染物。但是,地下水采样继续显示出高污染水平。在1998年末与环境监管机构讨论之后,商定了一项地下水监测计划,以研究石油燃料和三氯乙烯的共降解潜力。从六个现有钻孔(1C至6C)中采集了地下水样品。监控井孔的位置与过去的污染泄漏和新工厂大楼的布局有关。地下水样品的化学分析表明,三氯乙烯(TCE)的经典还原途径导致氯乙烯的水含量升高,导致氯乙烯的积累。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号