Ataturk dam, with its 84.5 million m~3 fill volume and 169 m height above the foundation, is one of the largest dams in the world. Its 1.2 million m~2 grout curtain surface area is the largest constructed in the world to date. The Bozova fault crosses the dam axis in the left bank and extends towards the downstream valley. The grout curtain constructed in karstic limestone is 180 m deep in the thalweg and partially extends to 250-300 m depths in some local zones on both the right and left sides of the valley. In this study, we have investigated leakage at the Ataturk dam and hydroelectric power plant by means of hydrometric measurements. The hanging grout curtain indicates that leakage at Ataturk dam is of vital importance in defining the longevity of the dam. Hydrometric measurements, including discharge, temperature and electrical conductivity of springs and leakages, were carried out for 9 years periodically, in addition to monitoring performed before, during and after construction. The leakage increased as the reservoir water level rose seasonally but it was also discovered that this regular increase was not observed in the last three measurements. The decrease in leakage volume in the last three measurements proved the integrity of the grout curtain and the efficiency of the microsol grout works. Recent seepage levels are within design limits and therefore have no serious effect on the stability of the dam structures.
机译:阿塔图尔克大坝的蓄水量为8450万立方米〜3,地基上方高169 m,是世界上最大的水坝之一。它的120万平方米的灌浆幕表面积为120万平方米,是迄今为止世界上最大的建筑。博佐瓦断层与左岸的大坝轴线相交,并向下游河谷延伸。用岩溶石灰岩建造的灌浆幕在thalweg深180 m,在山谷左右两侧的某些局部区域部分延伸至250-300 m深度。在这项研究中,我们通过水文测量法研究了阿塔图尔克大坝和水力发电厂的渗漏情况。悬挂的水泥浆幕表明,阿塔图尔克大坝的渗漏对于确定大坝的使用寿命至关重要。除在施工前,施工中和施工后进行监测外,还定期进行了9年的水文测量,包括排放,弹簧的温度和电导率以及泄漏情况。随着水库水位的季节性增加,泄漏量增加,但是还发现在最近的三个测量中没有观察到这种规律的增加。最近三个测量中泄漏量的减少证明了灌浆幕的完整性和微溶胶灌浆工作的效率。最近的渗漏水平在设计极限之内,因此对大坝结构的稳定性没有严重影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号