首页> 外文期刊>Engineering Geology >The uplift mechanism of the rock masses around the Jiangya dam after reservoir inundation. China
【24h】

The uplift mechanism of the rock masses around the Jiangya dam after reservoir inundation. China

机译:水库淹没后江崖大坝周围岩体的抬升机制。中国

获取原文
获取原文并翻译 | 示例
           

摘要

During filling of the Jiangya reservoir, a multi-purpose project in China Hunan province, it was found that the dam body and the rock masses on both valley sides were uplifted to various degrees, with a measured maximum uplift of 32.6 and 19.08 mm, respectively. This rare phenomenon caused concerns from various parties. The paper presents a systematic analysis on the factors that may possibly contribute to the uplift, on the basis of a comprehensive study of the geological background of the project and the observed data. To confirm the uplift mechanism of the confined hot aquifer, 3D numerical analysis and rock mechanical model test were also earned out. It is concluded that the rise of artesian head of the confined hot aquifer as a result of the reservoir inundation is the principal factor contributing to the uplift.
机译:在中国湖南省的一个多功能项目“江崖水库”充填过程中,发现坝体和山谷两侧的岩体都被不同程度地抬升,测得的最大抬升分别为32.6和19.08 mm。 。这种罕见的现象引起了各方的关注。在对项目地质背景和观测数据进行全面研究的基础上,本文对可能导致隆升的因素进行了系统分析。为了确定承压含水层的抬升机理,还进行了3D数值分析和岩石力学模型试验。得出的结论是,由于储层淹没,承压热含水层的自流顶上升是造成隆起的主要因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号