U. S. Steel Canada's Hamilton Works (the former Stelco Hamilton Works), in Hamilton, Ont., stack and bosh are covered by cast-iron staves, and the hearth wall is cooled by water spray. A pulverized coal injection facility was added in 1995 with design capacity up to 400 lb/NTHM. Typical operating conditions for this furnace include 135,000 scfm wind rate, 2,010°F hot blast temperature, and up to 9% oxygen enrichment of the blast for a high coal rate and natural gas rate. Originally, 'E' blast furnace was a two-bell-top furnace. In 1991, a single-hopper Paul Wurth Bell Less Top~R replaced the bell top. To set up the operational chute angles, two filling studies were conducted on the furnace in 1992 and 1999, respectively. In those two filling studies, as shown in Figure 2, a 23-foot x 2-foot bridge (datum bar) was placed across the furnace throat at the normal stockline of elevation 216 feet, 2 1/8 inches. A camcorder was mounted on a flare port to capture the impact ranges on the bar made by the discharged material. Figure 3 is a summary of the experimental results, showing the relationship between the impact range and chute angle for coke trajectories. It appears that the results measured in the two filling studies were consistent, except for the outer boundary at smaller chute angles. Based on the experimental data, appropriate chute angles were determined, which were applied at Hamilton Works 'E' blast furnace without any major changes.
机译:美国钢铁加拿大公司位于安大略省汉密尔顿的汉密尔顿工厂(前身为Stelco汉密尔顿工厂)的烟囱和烟囱被铸铁壁覆盖,炉膛壁被喷水冷却。 1995年增加了粉煤喷射装置,设计能力高达400磅/ NTHM。该炉的典型操作条件包括135,000 scfm的风速,2,010°F的热风温度,以及高煤速和天然气速的高炉氧气富集度高达9%。最初,“ E”高炉是两顶钟炉。 1991年,单料斗的Paul Wurth Bell Less Top〜R取代了钟形上衣。为了设置斜槽角度,分别在1992年和1999年对熔炉进行了两次填充研究。在这两个填充研究中,如图2所示,在炉喉上方的一个正常高度为216英尺(2 1/8英寸)的备用线上放置了一个23英尺x 2英尺的桥(基准杆)。便携式摄像机安装在火炬端口上,以捕获由排出物料制成的棒对冲击范围。图3是实验结果的摘要,显示了焦炭轨迹的冲击范围和斜道角度之间的关系。似乎在两次充填研究中测得的结果是一致的,除了在较小的斜槽角处的外边界。根据实验数据,确定合适的斜槽角度,该斜槽角度在Hamilton Works'E'高炉中使用,没有任何大的变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号