...
首页> 外文期刊>Engineering & Mining Journal >General Moly Says Mt. Hope on Track for Late 2010 Start
【24h】

General Moly Says Mt. Hope on Track for Late 2010 Start

机译:莫利将军说。希望在2010年底开始步入正轨

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In an early November update for its Mt, Hope molybdenum project, General Moly CEO Bruce D. Hansen said, "Despite the current difficult credit environment, we continue to be confident that the Mt, Hope project will be able to be financed. Given the project's overall quality, including high grades and low operating costs, in addition to the project's wide support from the steel industry, Mt. Hope continues to be on track to be fully permitted and financed in time for late 2010 startup." The Mt. Hope project is an 80:20 joint venture between General Moly and Korean steel-maker Posco.
机译:Moly首席执行官CEO布鲁斯·汉森(Bruce D. Hansen)在11月初对其希望山钼项目的更新中表示:“尽管目前信贷环境艰难,我们仍然相信,希望山钼项目将能够获得资金。该项目的整体质量,包括高品位和较低的运营成本,除了该项目在钢铁行业的广泛支持之外,希望山仍将继续按计划获得全额许可并在2010年下半年启动之前提供资金。”山。 Hope项目是General Moly与韩国钢铁生产商Posco的80:20合资企业。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号