首页> 外文期刊>Energy Source & Distribution >INDUSTRY RESPONDS TO INFRASTRUCTURE PRICING
【24h】

INDUSTRY RESPONDS TO INFRASTRUCTURE PRICING

机译:行业对基础设施定价的回应

获取原文
获取原文并翻译 | 示例
           

摘要

The Energy Networks Association (ENA) responded to the Australian Energy Market Commission's preliminary findings review of energy infrastructure revenue and price setting in February. ENA recommended to the commission that development of total factor productivity (TFP) enabling rules be deferred to a later stage and over a longer time frame than is currently proposed in the preliminary findings. "It is ENA's view that if the assumption is 1 introduction of a TFP option beyond 2018-19, then the commission's assessment should seek to account for the likelihood that the building blocks approach will evolve to seek to address many of the deficiencies identified," the ENA states.
机译:能源网络协会(ENA)回应了2月澳大利亚能源市场委员会对能源基础设施收入和价格设定的初步调查结果。 ENA向委员会建议,将全要素生产率(TFP)支持规则的制定推迟到比初步调查结果中目前建议的晚一些阶段,并在更长的时间范围内进行。 “ ENA的观点是,如果假设是在2018-19年度之后引入一种TFP方案,那么委员会的评估应设法考虑构建基块方法将演变为解决许多已发现的缺陷的可能性,” ENA规定。

著录项

  • 来源
    《Energy Source & Distribution》 |2010年第maraaapra期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 TEO;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号