...
首页> 外文期刊>Energy Argus petroleum coke >DTE may replace coal with coke at Monroe plant
【24h】

DTE may replace coal with coke at Monroe plant

机译:DTE可能在门罗工厂用焦炭代替煤炭

获取原文
获取原文并翻译 | 示例
           

摘要

DTE Energy’s Detroit Edison power subsidiary is evaluating burning petroleum coke at its more than 3,000MW Monroe power plant in Michigan, which would replace some of its coal needs. With the nearby Marathon Detroit refinery undergoing an upgrade to process additional heavy crude oils, including installing a new 28,000 b/d coker, there will soon be a large, inelastic supply of petroleum coke in the region that could serve as an alternative fuel for the large plant. Marathon expects the coker will produce about 1,500mt/day and plans to complete the project by the end of the year, possibly as soon as early November.
机译:DTE Energy的底特律爱迪生电力子公司正在评估其位于密歇根州超过3,000兆瓦的梦露电厂的燃烧石油焦,这将替代其部分煤炭需求。随着附近的马拉松底特律炼油厂进行升级以加工更多的重质原油,包括安装新的日产28,000桶的焦化器,该地区不久将有大量无弹性的石油焦供应,可以用作石油的替代燃料。大植物。 Marathon预计该焦化厂将每天生产约1500吨煤,并计划在今年年底之前(可能最快在11月初)完成该项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号