首页> 外文期刊>International Journal of Mining and Mineral Engineering >Reliability-based maintenance scheduling of haulage system of drum shearer
【24h】

Reliability-based maintenance scheduling of haulage system of drum shearer

机译:基于可靠性的鼓式采煤机牵引系统维护计划

获取原文
获取原文并翻译 | 示例
       

摘要

Drum shearer is the most important component of production chain in longwall mining. This machine is driven along the face by a powerful haulage system. In this paper, the reliability of haulage system of shearer has been analysed. The result showed that Time Between Failures (TBF) data of this system obeys the three-parameter Weibull distribution. On the basis of the achieved reliability model, the Preventive Maintenance (PM) scheduling has been suggested for different reliability levels. The reliability-based maintenance intervals for 90, 80, 70 and 50% reliability are 19.4, 35, 49 and 96.8 h, respectively. If 35 h are considered as the PM intervals, mean TBF will be increased by 16.2%.
机译:鼓式采煤机是长壁开采中生产链中最重要的组成部分。该机器由强大的牵引系统沿面部驱动。本文对采煤机牵引系统的可靠性进行了分析。结果表明,该系统的故障间隔时间(TBF)数据服从三参数Weibull分布。基于已实现的可靠性模型,已针对不同的可靠性级别建议了预防性维护(PM)计划。 90、80、70和50%可靠性的基于可靠性的维护间隔分别为19.4、35、49和96.8 h。如果将35小时作为PM间隔,则平均TBF将增加16.2%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号