首页> 外文期刊>Ecological engineering: The Journal of Ecotechnology >Fish passage principles to be considered for medium and large dams: The case study of a fish passage concept for a hydroelectric power project on the Mekong mainstem in Laos
【24h】

Fish passage principles to be considered for medium and large dams: The case study of a fish passage concept for a hydroelectric power project on the Mekong mainstem in Laos

机译:中型和大型水坝应考虑的鱼道原理:老挝湄公河干流水电项目鱼道概念的案例研究

获取原文
获取原文并翻译 | 示例
       

摘要

Fish passage systems may provide a means to mitigate the barrier effect of dams on migrating fish species. Even though design criteria were initially developed for the fish fauna of temperate regions, they are widely used in tropical rivers with relative success. A fish passage concept has been developed for a hydroelectric power project on the Mekong River in the absence of suitable fish passage design criteria. There are several hydropower dams proposed for development on the mainstem of the Mekong River in Cambodia, Laos, Thailand and China and the impact of hydropower on fisheries is fast becoming a big issue. Located in Laos territory, the present project is one of the promising run-of-river hydropower projects identified by the Mekong Secretariat in 1994. The feasibility study began in 2007 and the outline (basic) design is being completed in 2010. The scheme includes a comprehensive fish passage system, which provides facilities for upstream and downstream passage. The proposed fish passage concept is based on twelve principles and gives emphasis on an adaptive project management, which includes planning, implementation and operation of the fish passage system and other structures of the project. It will cater to the large number of species and high biomass and especially to the variable flow regime and the lack of biological knowledge on the behavior of migrating species.
机译:鱼类通过系统可以提供减轻水坝对鱼类迁移的屏障作用的手段。尽管最初为温带地区的鱼类区系制定了设计标准,但它们在热带河流中得到了广泛应用,并取得了相对成功。在没有合适的鱼道设计标准的情况下,为湄公河水电项目开发了鱼道概念。在柬埔寨,老挝,泰国和中国的湄公河干线上,有几座拟开发的水电大坝正在提出,水电对渔业的影响正迅速成为一个大问题。本项目位于老挝境内,是湄公河秘书处于1994年确定的有希望的河流上游水电项目之一。可行性研究于2007年开始,大纲(基本)设计于2010年完成。该计划包括完善的鱼类通过系统,为上游和下游通过提供设施。拟议的鱼类通过概念基于十二个原则,并强调了适应性项目管理,其中包括鱼类通过系统和项目其他结构的规划,实施和运营。它会满足大量物种和高生物量的需求,尤其是适应可变的流动方式以及缺乏有关迁移物种行为的生物学知识。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号