首页> 外文期刊>E&P daily >Total's Croatia LNG plans
【24h】

Total's Croatia LNG plans

机译:道达尔的克罗地亚液化天然气计划

获取原文
获取原文并翻译 | 示例
           

摘要

Total is looking to boost its position in liquefied natural gas(LNG)with the construction of a regasification terminal on the Croatian coast.Total,which has formed a new company,Adria LNG,to study the prospects for a terminal in the region,said it would be located on the Croatian island of Krk in the northern Adriatic.The new terminal would have an initial capacity of some 353 Bcf/yr(10 Bcm/yr)which would be increased to 530 Bcf/yr(15 Bcm/yr).It will be designed for LNG tankers carrying up to 9.35 MMcf(265 Mcm).
机译:道达尔(Total)希望通过在克罗地亚海岸建造一个再气化码头来提高其在液化天然气(LNG)中的地位。道达尔(Total)成立了一家新公司Adria LNG,以研究该地区该码头的前景新航站楼的初始容量约为353 Bcf /年(10 Bcm /年),将增加到530 Bcf /年(15 Bcm /年)。它将设计用于运载9.35 MMcf(265 Mcm)的LNG油轮。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号