StatoilHydro has been given the green light to carry out major modification work on its Troll C platform off Norway.Norway's Petroleum Safety Authority has given StatoilHydro the go-ahead to install and use a new separator module on the platform.The modifications are designed to increase the recovery rate from wells with a high degree of water/low reservoir pressure and to accelerate production from the wells.
展开▼