首页> 外文期刊>E & P: A Hart Energy Publication >Riser-keeping software works
【24h】

Riser-keeping software works

机译:上升沿保持软件有效

获取原文
获取原文并翻译 | 示例
           

摘要

A new onboard vessel/riser drift-off simulation for dynamically positioned drillships reduces risk and waiting-on-weather time. DP drilling operations have been conducted for about 30 years now, with significant advances in equipment and controls resulting in low failure rates for the latest generation of dynamically positioned (DP) vessels. Even with these advances, the major concerns with DP vessels are associated with the possible consequences in the event of loss of station keeping. Unless the proper planning is performed and both the operator and drilling contractor agree to well-specific operating criteria (WSOC) that are put in place before the well is drilled, the consequences of loss of station keeping could be high. When taking DP vessels into offshore locations such as the deepwater Gulf of Mexico, West Africa, Brazil, Australia, or others, a realistic basis for the WSOC becomes very critical to successful drilling and completions operations. It is in these situations that realistic numerical modeling of the well drilling system becomes important to ensure low risk and low waiting on weather time.
机译:动态定位的钻探船的新的船上/立管漂移仿真可降低风险和等待天气的时间。 DP钻探操作已经进行了大约30年,设备和控制技术取得了重大进步,导致最新一代动态定位(DP)船的故障率降低。即使有了这些进步,DP船的主要问题还是在失去站位保持的情况下可能带来的后果。除非执行适当的计划,并且操作员和钻井承包商都同意在钻探井之前制定的井特定操作标准(WSOC),否则失去站位保持的后果可能很高。将DP船运到墨西哥深水湾,西非,巴西,澳大利亚等深海地区时,WSOC的现实基础对于成功进行钻井和完井作业至关重要。在这些情况下,对钻井系统进行逼真的数值建模对于确保低风险和低等待时间至关重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号