【24h】

Moratorium by indecision

机译:优柔寡断的暂停

获取原文
获取原文并翻译 | 示例
       

摘要

Although the US DOI has issued new safety requirements for shallow-water operations in the GoM, drilling operations may continue to slow due to ambiguity on recertification procedures. "We were out of business and then we were in business, and then we were again out of business in 24 hours," said Tim Duncan, senior vice president of Phoenix Exploration, a small firm operating in the shallow water of the US Gulf of Mexico (GoM). Duncan made this public statement in an interview with CNBC broadcasting from Hart Energy's "Energy Capital Week" on Tuesday, June 15, 2010, in response to a question about President Obama's recent announcement that deepwater operations in the US GoM would be halted for six months while a full investigation of the Deepwater Horizon blowout is conducted.
机译:尽管美国DOI对GoM中的浅水作业发布了新的安全要求,但是由于对重新认证程序的含糊不清,钻井作业可能会继续放缓。菲尼克斯勘探公司高级副总裁蒂姆·邓肯说:“我们停业了,然后又开始营业,然后在24小时内又倒闭了。”墨西哥(GoM)。邓肯在2010年6月15日星期二接受哈特能源(Hart Energy)的“能源资本周”(Energy Capital Week)接受CNBC广播采访时发表了此公开声明,以回应有关奥巴马总统最近宣布将停止美国GoM深水作业六个月的问题同时对“深水地平线”井喷进行了全面调查。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号