首页> 外文期刊>Building Engineer >RMSTRONG OFF-SITE MANUFACTURED PLANTROOM SPEEDS UP MAJOR GLASGOW REGENERATION PROJECT
【24h】

RMSTRONG OFF-SITE MANUFACTURED PLANTROOM SPEEDS UP MAJOR GLASGOW REGENERATION PROJECT

机译:阿姆斯特朗异地制造的平面电影院加快了主要格拉斯哥的再生项目

获取原文
获取原文并翻译 | 示例
       

摘要

Armstrong Fluid Technology has played a key role in the delivery of the C0NNECT110NS project at 110 Queen Street, Glasgow. A fully integrated packaged plantroom for heating and air conditioning of the new building was off-site manufactured by Armstrong at its factory, speeding installation and reducing traffic at this busy city centre site. The new development at 110 Queen Street (the site of a former bank) is expected to provide the centre of Glasgow with 143,000 sq ft of offices and over 20,000 sq ft of retail space.
机译:阿姆斯特朗流体技术在格拉斯哥皇后街110号的C0NNECT110NS项目交付中发挥了关键作用。阿姆斯特朗在其工厂外现场制造了一套完全集成的,用于加热和空调的成套机房,以加快安装速度并减少繁忙城市中心的交通。皇后街110号(前银行所在地)的新开发项目预计将为格拉斯哥中心提供143,000平方英尺的办公室和超过20,000平方英尺的零售空间。

著录项

  • 来源
    《Building Engineer》 |2016年第3期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 09:11:54

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号