首页> 外文期刊>International Journal of Ventilation >Airtightness in New and Retrofitted U.S. Army Buildings
【24h】

Airtightness in New and Retrofitted U.S. Army Buildings

机译:新建和改建的美国陆军建筑物的气密性

获取原文
获取原文并翻译 | 示例
           

摘要

The Engineer Research and Development Center, Construction Engineering Research Laboratory (ERDC-CERL) recently developed design/construction strategies that improve the energy efficiency, reduce the potential for mould, and improve indoor air quality in newly constructed buildings and buildings undergoing major renovations. ERDC-CERL performed building envelope leakage tests on Army facilities to test their general integrity and the effect of increased airtightness on building energy consumption. Results were used to develop airtightness criteria and performance requirements for new construction and major renovation projects, which have been included in Army design/construction strategies. Since 2009, the U.S. Army Corps of Engineers (USACE) has implemented an airtightness requirement in all new construction and building enclosure renovation projects. Engineering and Construction Bulletin (ECB) 2012-16 set levels of airtightness for building enclosures at the material, assembly, and system level. ECB 2012-16 requires whole building air leakage tests to be conducted at completion of construction to verify the constructed air barrier system's performance. The current Air Leakage Test Protocol for Building Envelopes developed by ERDC-CERL, the Air Barrier Association of America (ABAA), and other industrial partners was published in May 2012. This paper presents the results of airtightness tests before and after the new requirements were established, updated results for air leakage tests of more than 285 newly constructed and renovated large buildings, and a performance analysis of the design and construction process, air barrier materials, building use, and construction types. These data may support future decisions regarding airtightness levels to be adopted for commercial buildings.
机译:建筑工程研究实验室(ERDC-CERL)的工程师研究与发展中心最近制定了设计/施工策略,以提高能源效率,减少发霉的可能性并改善新建建筑物和进行大修的建筑物的室内空气质量。 ERDC-CERL对陆军设施进行了建筑围护结构泄漏测试,以测试其整体完整性以及气密性增加对建筑能耗的影响。结果被用于制定新建筑和大型翻新项目的气密性标准和性能要求,这些已包括在陆军设计/施工策略中。自2009年以来,美国陆军工程兵团(USACE)对所有新建筑和建筑物围护结构改造项目均实施了气密性要求。工程和施工公告(ECB)2012-16在材料,装配和系统级别设置了建筑围护结构的气密性级别。 ECB 2012-16要求在施工结束时进行整个建筑物的空气泄漏测试,以验证所构建的空气屏障系统的性能。由ERDC-CERL,美国空气屏障协会(ABAA)和其他工业合作伙伴共同制定的当前建筑围护结构空气泄漏测试协议已于2012年5月发布。本文介绍了新要求之前和之后的气密性测试结果。建立,更新了285座新建和翻新的大型建筑物的漏气测试结果,并对设计和建造过程,阻气材料,建筑物用途和建造类型进行了性能分析。这些数据可能支持将来有关将要用于商业建筑的气密性水平的决定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号