...
首页> 外文期刊>International Journal of IT in Architecture, Engineering and Construction >A fuzzy approach for evaluating the iterated implementation of innovations in construction
【24h】

A fuzzy approach for evaluating the iterated implementation of innovations in construction

机译:模糊评估建筑创新实施情况的方法

获取原文
获取原文并翻译 | 示例

摘要

A fundamental challenge of implementing construction innovations is the planning and control of work. Most innovative projects do not fulfil their time and/or cost. Evaluation of innovation performance is not often simulated within existing innovation process models. Such an evaluation enables managers to accept new processes/ products or iterate the implementation process to achieve satisfactory performance. This paper introduces a conceptual model that deals with the effectiveness of the innovation implementation phase. This model adopts the Dependency Structure Matrix (DSM) tool to simulate the iterated implementation of an innovation. The model uses influence information, and managerial and technological performance to control and simulate the implementation of innovations by their nature of experimentation, iteration and refinement. The paper presents a fuzzy logic approach to identify the required classification of interdependencies among iterated tasks within the DSM. Analysis of the model resulted in the implementation of innovations being programmed more effectively.
机译:实施施工创新的根本挑战是工作的计划和控制。大多数创新项目无法满足其时间和/或成本。在现有创新过程模型中,通常不会模拟对创新绩效的评估。这样的评估使管理人员能够接受新的流程/产品或迭代实施流程以实现令人满意的绩效。本文介绍了一个概念模型,用于处理创新实施阶段的有效性。该模型采用了依赖结构矩阵(DSM)工具来模拟创新的迭代实现。该模型利用影响力信息以及管理和技术绩效,通过实验,迭代和完善的性质来控制和模拟创新的实施。本文提出了一种模糊逻辑方法,用于识别DSM中迭代任务之间的相互依赖性分类。对模型的分析导致对创新的实施得到了更有效的编程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号