...
首页> 外文期刊>International Journal of Simulation Modelling >TASK SCHEDULING OF AGV IN FMS USING NON-TRADITIONAL OPTIMIZATION TECHNIQUES
【24h】

TASK SCHEDULING OF AGV IN FMS USING NON-TRADITIONAL OPTIMIZATION TECHNIQUES

机译:使用非传统优化技术的FMS AGV任务调度

获取原文
获取原文并翻译 | 示例
           

摘要

Flexible Manufacturing System (FMS), which is equipped with several CNC machines and Automated Guided Vehicle (AGV) based material handling system is designed and implemented to gain the flexibility and efficiency of production. After the implementation of FMS, in practice, the scheduling of the resources, such as frequent variation in the parts, tools, AGV routings, becomes a complex task. This is being done traditionally using various mathematical programming techniques. In recent years, random search algorithms have been attempted for scheduling. Most of the research has been emphasized only on single objective optimization. Multi objective problems in scheduling with conflicting objectives are more complex and combinatorial in nature and hardly have a unique solution. This paper addresses multi objective task scheduling of AGV in a flexible manufacturing environment using non-traditional optimization algorithms. In this paper the authors made an attempt to find the near-optimum schedule for two AGVs based on the balanced workload and the minimum traveling time for maximum utilization. The proposed methods are exemplified with illustrations.
机译:柔性制造系统(FMS)配备有多台CNC机器和基于自动导引车(AGV)的物料处理系统,旨在提高生产的灵活性和效率。在实施FMS之后,实际上,资源的调度(例如零件,工具的频繁变化,AGV路线选择)成为一项复杂的任务。传统上,这是使用各种数学编程技术来完成的。近年来,尝试了随机搜索算法来进行调度。大多数研究只强调单一目标优化。具有冲突目标的日程安排中的多目标问题本质上更加复杂和组合,几乎没有唯一的解决方案。本文使用非传统优化算法解决了柔性制造环境中AGV的多目标任务调度问题。在本文中,作者试图根据平衡的工作量和最短的旅行时间来为两辆AGV寻求接近最佳的时间表,以实现最大的利用率。所提出的方法以例证为例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号