...
首页> 外文期刊>International Journal of Oil, Gas and Coal Technology: IJOGCT >Development of a time-dependent economic method with start time consideration to optimise gas-lift allocation and scheduling
【24h】

Development of a time-dependent economic method with start time consideration to optimise gas-lift allocation and scheduling

机译:开发具有时间依赖性的经济方法,并考虑开始时间以优化气举分配和调度

获取原文
获取原文并翻译 | 示例
           

摘要

The gas lift allocation optimisation is an important operational problem. In this paper, we present a method to optimise the lift gas allocation profile and determine the best time to start the gas-lift operation for each well. To tackle the nonlinear optimisation, an estimation of distribution algorithm (EDA) is employed based on Gaussian Bayesian networks and Gaussian kernels and the results are compared with those obtained by particle swarm optimisation (PSO) and genetic algorithms (GAs). Gas-lift performance for all the wells along with estimated cumulative production data are correlated over time to develop a model to show the field production behaviour as a function of the gas injection rates and initiation parameters. The developed model is coupled with an economic model to maximise the net present value of the gas-lift process for the field.
机译:气举分配优化是一个重要的操作问题。在本文中,我们提出了一种优化举升气分配曲线并确定开始每口气举气作业的最佳时间的方法。为了解决非线性优化问题,在高斯贝叶斯网络和高斯核的基础上,采用了分布估计算法(EDA),并将结果与​​通过粒子群优化(PSO)和遗传算法(GA)获得的结果进行了比较。随着时间的推移,将所有井的气举性能与估计的累计生产数据关联起来,以建立一个模型,以显示随气注入速率和初始参数而变化的现场生产行为。开发的模型与经济模型相结合,以最大程度地提高气举工艺的净现值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号