首页> 外文期刊>International Journal of Applied Engineering Research >Analysis of Cost and Returns from NHAI - A Case Study of Nh45
【24h】

Analysis of Cost and Returns from NHAI - A Case Study of Nh45

机译:NHAI的成本和收益分析-以Nh45为例

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

NHAI is one of the most important PPP project undertaken in India. The National Highways connects India from Kashmir to Kanyakumari and from Maharashtra to West Bengal. Twelve National Highways cross through Tamil Nadu, which has a total distance of 4462 Kms. From the stage of acquiring encumbrance land to the construction of NH, costs are incurred at various stages. The cost of one stretch of NH is different from the cost of another stretch of NH. Cost depends on number of factors like the over bridges, ROB, RUB and culverts, and also on the nature of elevations construction. Depending on the cost, basic toll rates are determined. In this paper analysis of Cost and Revenue are taken up for two stretches of NH 45.
机译:NHAI是印度开展的最重要的PPP项目之一。国家公路连接印度从克什米尔到Kanyakumari,从马哈拉施特拉邦到西孟加拉邦。十二国道横穿泰米尔纳德邦(Tamil Nadu),总距离为4462公里。从获取保留土地的阶段到NH的建设,在各个阶段都会产生成本。一段NH的成本与另一段NH的成本不同。成本取决于桥梁,ROB,RUB和涵洞等因素的数量,还取决于立面建筑的性质。根据成本确定基本的通行费率。在本文中,对成本和收入的分析针对的是NH 45的两个拉伸段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号