首页> 外文期刊>Internatinoal gas engineering and management >Elgin North Sea gas platform resumes production almost year after leak
【24h】

Elgin North Sea gas platform resumes production almost year after leak

机译:埃尔金北海天然气平台泄漏后将近一年恢复生产

获取原文
获取原文并翻译 | 示例
       

摘要

Production has resumed on the Elgin North Sea gas platform almost a year after it was evacuated due to a major Leak. The shutdown cost operator Total millions of pounds in Lost income and repair costs and was partLy blamed for the UK's double-dip recession Last year. Gas production resumed in March but it could take two years to return to the output of the platform before the gas leak, Total said.
机译:由于重大泄漏而被撤离后,埃尔金北海天然气平台的生产已经恢复了将近一年。停产成本运营商总计损失了数百万英镑的收入和维修成本,而去年英国两次陷入衰退也应归咎于此。道达尔表示,天然气生产已于3月恢复,但要等到两年后才能恢复到平台的产量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号