Integrating packaged equipment

机译:集成包装设备

获取原文
获取原文并翻译 | 示例

摘要

Integrating controls from an equipment supplier successfully within a plant supervisory control and data acquisition (SCADA) system or distributed control system (DCS) requires communication on multiple levels. These include the process of design, mechanical fit up, and installation, as well as coordination to get the equipment to work in concert with the plant's other control systems. Simply looking after mechanical and electrical details is not enough. To be successful, the plant's system integrator and the equipment supplier's programmable logic controller (PLC) programmer must work with each other throughout the entire project's development. From the perspective of an equipment supplier, several things can help streamline the process of integrating packaged equipment into a plant. First and foremost is planning. Both parties--the plant designer and the equipment supplier--need to understand and appreciate what the equipment is supposed to be doing--and how it will do it--in the context of the entire plant. This includes both the process design and the controls design.
机译:要成功地将设备供应商的控制集成到工厂监督控制和数据采集(SCADA)系统或分布式控制系统(DCS)中,需要进行多级通信。其中包括设计,机械装配和安装过程,以及协调使设备与工厂其他控制系统协同工作的过程。仅照顾机械和电气细节是不够的。为了取得成功,工厂的系统集成商和设备供应商的可编程逻辑控制器(PLC)程序员必须在整个项目的开发过程中相互配合。从设备供应商的角度来看,有几件事可以帮助简化将打包的设备集成到工厂的过程。首先是计划。双方-工厂设计人员和设备供应商-都需要了解和欣赏设备在整个工厂范围内应该做什么-以及它将如何做。这包括过程设计和控制设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号