...
首页> 外文期刊>Australian Mining >Toro 0011 helps EROC achieve significant project milestones at Ridgeway Project.
【24h】

Toro 0011 helps EROC achieve significant project milestones at Ridgeway Project.

机译:Toro 0011帮助EROC在Ridgeway项目上实现了重要的项目里程碑。

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

WHEN TACKLING THE CHALLENGES OF constructing a new mine and undertaking ongoing, crucial development works, any contractor recognises the need for the right people, the right equipment and the right management to produce the right results. In planning for work at Newcrest's Ridgeway Mine, leading Australian underground mining contractor EROC was searching for reliability, productivity and efficiency of equipment. It was out of this search that a long-term partnership with Sandvik Mining and Construction was born. Through the partnership, Tamrock supplied EROC with ten Toro 40D and 50D trucks, four Toro 0010 loaders, four Minimatic Jumbos and a Robolt to complete the early phase of the project, which included the development of the conveyor decline.
机译:在应对建造新矿场并进行持续,关键的开发工作的挑战时,任何承包商都意识到需要合适的人员,合适的设备和合适的管理来产生合适的结果。在计划在Newcrest的Ridgeway矿进行工作时,领先的澳大利亚地下采矿承包商EROC正在寻求设备的可靠性,生产率和效率。正是出于这种寻找,与山特维克矿业和建筑公司建立了长期合作伙伴关系。通过合作关系,Tamrock为EROC提供了十台Toro 40D和50D卡车,四台Toro 0010装载机,四台Minimatic Jumbos和一台Robolt,以完成该项目的早期阶段,其中包括输送机下降的开发。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号