首页> 外文期刊>Automation and Remote Control >Solution of one problem of resource allocation in real-time automated control system in the presence of uncertain factors
【24h】

Solution of one problem of resource allocation in real-time automated control system in the presence of uncertain factors

机译:存在不确定因素的实时自动控制系统中一个资源分配问题的解决

获取原文
获取原文并翻译 | 示例
           

摘要

The problem of allocating the amended resources in a real-time automated control system under a constrained time of executing the given assembly of uninterrupted jobs was considered. At some indefinite time instants, the resources available can be given to higher-priority jobs. As the result, execution of the initial job assembly is suspended, thus violating the initial schedule. A strategy of constructing admissible schedules with the minimum probability of their violation was developed.
机译:考虑了在执行给定的不间断作业装配的约束时间下在实时自动控制系统中分配修改后的资源的问题。在某些不确定的时刻,可以将可用资源分配给优先级较高的作业。结果,初始作业程序集的执行被暂停,从而违反了初始计划。制定了一种策略,以最小的违规概率来构建可允许的进度表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号