...
首页> 外文期刊>Australia's Paydirt >Mutiny simplifies Deflector plan
【24h】

Mutiny simplifies Deflector plan

机译:兵变简化了偏转器计划

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Mutiny Gold Ltd hopes to lock in funding for the development of the Deflector gold project as soon as possible after completing an internal review to simplify the initial mine plan. Based on figures from the 2013 DFS, the new mine plan proposes to reduce the size of the open pit from 23.2mt to 4.8mt, based on both rock properties and ore thickness. The new open pit will be mined to 85m on the western lode and 35m on the central lode, which allows for underground access just three months after the start of open-pit mining.
机译:Mutiny Gold Ltd希望在完成内部审查以简化最初的采矿计划后尽快为开发Deflector黄金项目锁定资金。根据2013 DFS的数据,新矿山计划建议根据岩石性质和矿石厚度,将露天矿的尺寸从23.2公吨减少到4.8公吨。新的露天矿将在西部矿床开采到85m,在中央矿床开采到35m,这允许在露天矿开采开始仅三个月后进入地下。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号