首页> 外文期刊>Australian Concrete Construction >An innovative, environmentally friendly formwork system has provided a cost-effective construction solution on a new development in Melbourne's Albert Park. Lightweight, strippable plastic planks manufactured and supplied by ICF Contracting were used
【24h】

An innovative, environmentally friendly formwork system has provided a cost-effective construction solution on a new development in Melbourne's Albert Park. Lightweight, strippable plastic planks manufactured and supplied by ICF Contracting were used

机译:创新的环保模板系统为墨尔本艾伯特公园的新开发项目提供了经济高效的建筑解决方案。使用由ICF Contracting生产和供应的轻质可剥离塑料木板

获取原文
获取原文并翻译 | 示例
           

摘要

Construction of a new regional shopping centre on the New South Wales Southern Highlands involved the use of the latest structural steel formwork on a site, which 160 years ago was home to Australia's first iron works. Woolworths Limited has won wide praise for modifying its plans for the site of the former Fitzroy Iron Works at Mittagong after excavations revealed archeological discoveries of much greater significance than had been expected. The company changed its plans for the Highlands Marketplace development to showcase the relics, relinquished 60 car spaces and conducted an open day at the historic site before building work began.
机译:在新南威尔士州南部高地上建造新的区域购物中心涉及在一个场地上使用最新的钢结构模板,该模板是160年前澳大利亚第一座铁工厂的所在地。 Woolworths Limited因对考古发现的重大发现超出了预期,而修改了其在米塔贡的前Fitzroy铁厂的选址计划而赢得了广泛赞誉。该公司改变了开发高地市场的计划,以展示文物,放弃了60个车位,并在建筑工地开始前在历史古迹进行了开放日活动。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号