...
首页> 外文期刊>Asian glass >Building the Opus
【24h】

Building the Opus

机译:建立作品

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Opus project was initiated in 2006. Commissioned by Omniyat, Zaha Hadid Architects developed a design resembling a cube with the core melted out. The 20 story building,-originally offices,was later changed to mixed used-situated in Business Bay, Dubai, UAE, is fully glazed. The outer flat facades are neutral transparent glazed with a silver mirror pattern, while the core area is dark blue 3D formed glazing. To accomplish this vision, several glass processing technologies were studied, selected, specified-and some abandoned after further studies. Challenges included realizing the 3D double curved shape, achieving the color, attaining adequate performance for the Dubai climate, dealing with the radiation focusing effect the geometry imposes, ensuring a seamless visual appearance among the different support systems (roof, wall, soffit), procuring special materials in sufficient quantities in reasonable time and keeping the project affordable. Koltay Facades was involved from the beginning and acted as facade consultant to achieve the project handover at the end of 2015.
机译:Opus项目于2006年启动。扎哈·哈迪德建筑师事务所(Zaha Hadid Architects)受Omniyat委托,开发了一种类似立方体的设计,其核心熔化了。这座20层高的建筑最初是办公室,后来又改成了混合建筑,位于阿联酋迪拜的商业湾,全为玻璃。外部平面立面为中性透明玻璃,并带有银色镜面图案,而核心区域为深蓝色3D形成的玻璃。为了实现这一愿景,对几种玻璃加工技术进行了研究,选择,指定,有些则在进一步研究后被放弃。挑战包括实现3D双曲面形状,实现色彩,在迪拜气候下获得足够的性能,处理几何形状所施加的辐射聚焦效果,确保不同支撑系统(屋顶,墙壁,拱腹)之间的无缝视觉外观,采购在合理的时间内提供足够数量的特殊材料,并使项目负担得起。 Koltay Facades从一开始就参与其中,并担任门面顾问,以在2015年底实现项目移交。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号