Global Process Systems (GPS) is in the final stages of refurbishing several in-stock,unused 70,000 barrels of water per day (bw/d) water injection packages for the Murphy Sarawak Oil Co's West Patricia WP-IA waterflood platform.Originally designed for UK NOrth Sea fpso operation,the packages were tailored and refurbished to meet the requirements of the West Patricia platform.Originally designed for UK North Sea FPSO operation,the packages were tailored and refurbished to meet the requirements of the West Patricia platform.
展开▼
机译:全球过程系统(GPS)处于翻新的最后阶段,该阶段是为墨菲砂拉越石油公司的西帕特里夏WP-IA注水平台翻新的几个库存,未使用的每日70,000桶水(bw / d)注水套件。 UK North Sea fpso操作,这些包是为满足West Patricia平台的要求而量身定制和翻新的。这些包装最初是为UK North Sea FPSO操作而设计的,它们是针对West Patricia平台的要求而量身定制和翻新的。
展开▼