Real Energy has concluded re-completion operations at the Tamarama-1 well in the ATP 972P permit in Queensland, Australia. During the operations, Real removed the existing tubing and re-entered the lower diversion assemblies with a small drill to mechanically remove the blockage in the tubing string. The well has now completed with a production tubing string and the post-frac flow back operation has resumed, Real noted.
展开▼