...
首页> 外文期刊>ASCE News >The Phoenix Project, The Pentagon -- Arlington, Virginia
【24h】

The Phoenix Project, The Pentagon -- Arlington, Virginia

机译:五角大楼凤凰计划-弗吉尼亚州阿灵顿

获取原文
获取原文并翻译 | 示例

摘要

At 10:30 A.M. on September 11, 2001, in the aftermath of the terrorist attack on the Pentagon, KCE Structural Engineers, P.C., a consulting firm based in Washington, D.C., was called in to provide emergency assistance to the Military District of Washington, the Federal Bureau of Investigation, and the Pentagon Renovation Program. KCE provided emergency stabilization analysis and immediately began investigating the foundation, evaluating material strengths, and determining which areas were to be demolished and which methods were to be used in the demolition. Early estimates suggested that rebuilding the damaged portion of the Pentagon could take three to four years. As it turned out, an unprecedented degree of cooperation on the part of engineers, contractors, and emergency personnel resulted in substantial completion of the work-dubbed the Phoenix Project-just one year after the attack.
机译:上午10:30 2001年9月11日,在五角大楼遭受恐怖袭击之后,驻华盛顿特区的咨询公司KCE结构工程师PC被召集为华盛顿特区的军事区提供紧急援助。调查和五角大楼改造计划。 KCE提供了紧急稳定分析,并立即开始调查地基,评估材料强度并确定要拆除的区域和拆除方法。初步估计表明,重建五角大楼的受损部分可能需要三到四年。事实证明,工程师,承包商和紧急人员之间空前的合作程度导致了被称为“凤凰计划”的工作在袭击发生仅一年后就基本完成。

著录项

  • 来源
    《ASCE News》 |2003年第3期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号