首页> 外文期刊>Argus nefte transport >Diesel switch complete
【24h】

Diesel switch complete

机译:柴油开关完成

获取原文
获取原文并翻译 | 示例
       

摘要

Transneft’s product pipeline system is now fully able to ship 10ppm sulphur diesel from Russian refineries to the Latvian port of Ventspils. And it can also supply the product for delivery to the Russian Black Sea outlets of Novorossiysk and Tuapse. The process of enabling 10ppm diesel to be shipped through the system was completed on 1 April, Transneft says. The company began pumping 10ppm to Ventspils in alternating batches with 50ppm product in March, although the quality of product emerging in the port varied over the course of that month.
机译:Transneft的产品管道系统现已完全能够将10ppm的硫柴油从俄罗斯的炼油厂运至拉脱维亚的文茨皮尔斯港口。它还可以提供产品,以交付给新罗西斯克和图阿普斯的俄罗斯黑海网点。 Transneft说,使10ppm柴油能够通过系统运输的过程已于4月1日完成。该公司从3月开始以50ppm产品交替分批向Ventspils泵送10ppm,尽管该月在港口出现的产品质量有所不同。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号