...
【24h】

Power profiling

机译:动力分析

获取原文
获取原文并翻译 | 示例

摘要

A surge of investment in offshore renewable energy generation in recent years has given rise to a fast expanding fleet of specialised vessels capable of transporting and installing wind turbines in huge arrays. There are operational challenges in establishing wind turbines of increasing unit power and size, at greater distances from land and in water depths up to 60m. The nature of the propulsion and manoeuvring arrangements are absolutely critical to performance under the exacting contractual and environmental conditions faced by operators of wind turbine installation vessels (WTIVs).
机译:在海洋可再生能源的投资代近年来了迅速扩张的专业船舶运输和安装风的能力涡轮机在巨大的数组。建立风力涡轮机的挑战提高单位功率和尺寸更大距离陆地和水的深度60米。安排绝对是至关重要的严格的合同和条件下的性能运营商面临的环境条件风力发电机安装船只(WTIVs)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号