...
首页> 外文期刊>Energy in East Europe >PKE starts CHP build in May
【24h】

PKE starts CHP build in May

机译:PKE CHP开始构建

获取原文
获取原文并翻译 | 示例
           

摘要

Energetyczny (PKE), said January 18 that construction of a new 50 MW capacity heating block at its ZEC Bielsko-Biala CHP plant in southern Poland would start in May. In December PKE signed a contract with Polish engineering firm, Polimex-Mostostal, to build the new hard coal-fired block, which will cost an estimated Zloty 594 million ($206 million) and contain a fluidized bed boiler, back pressure turbine, two peak-load boilers and heat accumulator. The block is scheduled to be commissioned in the first half of 2013.
机译:Energetyczny (PKE)表示,1月18日建设一个新的50 MW供热能力块的舍Bielsko-Biala CHP工厂波兰南部将开始。与波兰工程PKE签署了一份合同公司Polimex-Mostostal努力构建新的燃煤块,成本估计5.94亿兹罗提(合2.06亿美元),包含一个流化床锅炉,背压式汽轮机,两个锅炉及蓄热体峰值负荷。上半年将委托吗2013股。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号