【24h】

ESD forms alliance triad

机译:ESD形式联盟三

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

ESD, or Efficient Service Delivery, has a £560M deal to deliver projects, such as work on reservoirs, water treatment works and pumping stations, over the next six years for Scottish Water's non-infrastructure Quality and Standards IV (Q&S) framework. Projects being worked on by ESD include a £12.4M, two-year scheme to tackle sewer flooding in Elmvale Row, Springburn, where 34 properties have experienced recurring problems with flooding for a number of years. aBV is installing 13,500m3 of stormwater storage into the sewer network to alleviate the surcharging of the sewer system.
机译:防静电,或有效的服务交付,£560协议,交付项目,比如工作水库、水处理厂、抽水苏格兰电台,在接下来的六年水的non-infrastructure质量和标准四世(q和s)框架。委托人包括£12.4,两年的方案来解决污水涌入Elmvale行Springburn,34个属性经历反复出现的问题与洪水许多年了。安装13500立方米的雨水存储下水道网络缓解的附加费下水道系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号