...
【24h】

UU shelves aqueduct project

机译:UU货架渡槽工程

获取原文
获取原文并翻译 | 示例

摘要

UU has put a major multimillion-pound aqueduct maintenance and repair project on the backbumer as a result of its recent cryptosporidium crisis. About 450 people were ready to work on the 56-mile Haweswater Aqueduct, and a bespoke training camp was to run from September 21 to ensure everyone was "ready to hit the ground running".
机译:UU主要数百万英镑的渡槽backbumer维修项目由于最近的隐孢子虫的危机。大约有450人是准备工作56英里的Haweswater渡槽和定制训练营是运行于9月21日确保每个人都“准备撞到地面运行”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号