...
首页> 外文期刊>WET news: Water & effluent treatment news >Crampton WTW's 21st century makeover
【24h】

Crampton WTW's 21st century makeover

机译:21世纪Crampton WTW的改造

获取原文
获取原文并翻译 | 示例

摘要

The extensive £4.6M upgrade undertaken by J Murphy & Sons at South East Water's (SEW) Cramptons Road water treatment works (WTW) at Sevenoaks, Kent demanded ten programmed shutdowns of key, live supply pipelines while still ensuring the 45-year old plant always remained fully operational. In addition, the area's great crested newts and resident bats were carefully protected while more than 2km of new pipework was integrated into the original site layout. The new pipework re-routes borehole water supplies through the plant's contact storage tank and into existing pipework feeding three nearby service reservoirs.
机译:广泛的£4.6升级由J墨菲和儿子在东南亚水(缝)crampton道路水处理厂(WTW) Sevenoaks,肯特要求10程序关闭键,生活供应管道,同时确保45年老厂始终全面运作。此外,该地区的大冠蝾螈居民蝙蝠仔细而更多保护2公里的新管道工程集成到原来的网站布局。通过植物的钻孔水供应联系现有储罐和管道工程喂养三水库附近的服务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号