...
首页> 外文期刊>WET news: Water & effluent treatment news >Shutdown strategy saves time and money
【24h】

Shutdown strategy saves time and money

机译:关闭策略可以节省时间和金钱

获取原文
获取原文并翻译 | 示例

摘要

Away to shutdown an entire sewage treatment works without using storm facilities has been devised by a Costain team working at Severn Trent Water's Stratford Milcote facility. The strategy was developed and trialled while the team installed a new inlet works with associated screens and handling at the sewage treatment works. Tom Grainger-White, Costain senior site agent, said the strategy reduces risk and saves money. He said: "Traditionally when a treatment works is shutdown, foul water is transferred to tankers and then transported to other sites. By compiling information such as how wastewater flowed between the 15 pump stations that fed the site, and carrying out tests to check those interactions, we were able to turn off individual stations.
机译:关闭整个污水处理厂不使用风暴设施被设计了由Costain团队在Severn特伦特水的工作斯特拉特福德Milcote设施。开发和试点团队安装新入口与屏幕和有关在污水处理厂处理。Grainger-White, Costain高级网站代理,说这个策略降低风险,节省金钱。说:“传统上治疗工作时关闭,污水转移到油轮然后运送到其他网站。信息,如废水之间流动美联储网站15泵站,进行测试,以检查这些交互,我们可以关掉个人电台。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号