...
首页> 外文期刊>World highways >Liebherr L 580 makes light of greywacke work
【24h】

Liebherr L 580 makes light of greywacke work

机译:利勃海尔L 580杂砂岩工作变得容易

获取原文
获取原文并翻译 | 示例
           

摘要

Quarrying company Guenter Jung operates a very special fleet of machinery, which boasts the L 580 XPower wheeled loader as its latest addition in the quarry in Drolshagen. "The L 580 XPower is predominantly used in load-and-carry applications and feeds material into crushers and lorries," said company owner Guenter Jung. His firm produces bulk material of various quality grades for use in special-purpose civil engineering. The high-quality quarry stones, irregular paving slabs, decorative stones and rectangular stone blocks are used in both construction and landscaping. The L 580 XPower picks up blast material at the quarry face and transports it to the two crusher units around 100m away. With its power-split driveline, the nearly-28tonne wheeled loader has no difficulty in covering this distance, which includes an incline of around 15m in length, explained Jung .
机译:采石公司京特·荣格非常特殊的机械,拥有L580年XPower轮式装载机为最新在采石场Drolshagen。主要用于load-and-carry应用程序和材料在破碎机和卡车。”公司所有者京特·荣格说。不同质量等级的生产散装材料用于特殊用途的土木工程。高质量的采石场石头,不规则铺平道路板、装饰石头和矩形的石头块在建设和使用景观。材料在采石场的脸和传输这两种破碎机单位约100。功率分流传动,nearly-28tonne轮式装载机在报道这次没有困难距离,其中包括一个坡度约15米长,荣格解释道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号