...
首页> 外文期刊>Institute of Water journal >KSB SUPPLY PUMPS TO THE RENFREW FLOOD PREVENTION SCHEME ON THE RIVER CLYDE
【24h】

KSB SUPPLY PUMPS TO THE RENFREW FLOOD PREVENTION SCHEME ON THE RIVER CLYDE

机译:伦弗鲁防汛KSB供应泵计划在克莱德河上

获取原文
获取原文并翻译 | 示例
           

摘要

The flood prevention scheme will protect homes and businesses in North Renfrew and comprises a 3m high embankment and a new underground pumping station at the Mill Burn at Fingal Road. The embankment, which runs westward for 1km from Ferry Road, provides a barrier against direct flooding from the Clyde. The pumping station containing KSB pumps will ensure that tidal surges on the Clyde do not cause the Mill Burn to overflow and flood local properties. The pumping station provides a capacity of 5.5m~3/s to provide standard protection against tidal flooding from the River Clyde and fluvial flooding from Mill Burn. The pumping station's maximum flow rate has been specified to cover a 1 in 200 year flood event.
机译:洪水会保护家庭和预防方案企业在北伦弗鲁,由3 m高路堤和一个新的地下抽水站在机燃烧芬戈尔。堤,西1公里轮渡路,对直接提供了一个屏障洪水从克莱德。包含KSB泵将确保潮汐激增的克莱德不导致轧机燃烧当地属性溢出和洪水。站提供一个容量为5.5米~ 3 / s提供标准保护潮汐克莱德河的洪水和河流洪水从机燃烧。最大流量已指定覆盖1200年洪水事件。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号