Customer order scheduling on a single machine with family setup times: Complexity and algorithms

机译:具有系列设置时间的单台机器上的客户订单调度:复杂性和算法

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

We consider a situation where C customers each order various quantities (possibly zero in some cases) of products from P different families, which can be produced on a continuously available machine in any sequence (requiring a setup whenever production switches from one family to another). We assume that the time needed for a setup depends only on the family to be produced immediately after it, and we follow the item availability model (which implies that all units are ready for dispatch as soon as they are produced). However, an order is shipped only when all units required by a customer are ready. The time from the start (time zero) to the completion of a customer order is called the order lead time. The problem, which restates the original description of the customer order scheduling problem, entails finding a production schedule that will minimize the total order lead time. While this problem has received some attention in the literature, its complexity status has remained vexingly open. In this note, we show for the first time that the problem is strongly NP-hard. We proceed to give dynamic programming based exact solution algorithms for the general problem and a special case (where C is fixed). These algorithms allow us to solve small instances of the problem and understand the problem complexity more fully. In particular, the solution of the special case shows that the problem is solvable in polynomial time when C is fixed. (c) 2006 Elsevier Inc. All rights reserved.
机译:我们考虑了这样一种情况,C客户各自从P个不同系列订购了各种数量的产品(在某些情况下可能为零),这些产品可以按任何顺序在连续可用的机器上生产(每当生产从一个系列切换到另一个系列时,都需要进行设置) 。我们假设设置所需的时间仅取决于紧随其后要生产的系列,并且我们遵循物料可用性模型(这意味着所有单元一经生产就准备好进行派遣)。但是,仅在客户所需的所有单元都准备就绪时才发货。从开始(零时间)到完成客户订单的时间称为订单提前期。该问题重现了客户订单计划问题的原始描述,需要找到将总订单提前期最小化的生产计划。尽管这个问题已在文献中引起关注,但其复杂性状态仍然令人生厌。在本说明中,我们首次展示了该问题在很大程度上是NP难题。我们着手针对一般问题和特殊情况(其中C是固定的)给出基于动态规划的精确求解算法。这些算法使我们能够解决问题的小实例并更全面地了解问题的复杂性。特别地,特殊情况的解决方案表明,当C固定时,该问题可以在多项式时间内解决。 (c)2006 Elsevier Inc.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号