...
首页> 外文期刊>Disease Prevention Daily. >Data on Machine Learning Detailed by Researchers at School of Civil Engineering (Risk Identification, Assessments, and Prediction for Mega Construction Projects: A Risk Prediction Paradigm Based on Cross Analytical-Machine Learning Model)
【24h】

Data on Machine Learning Detailed by Researchers at School of Civil Engineering (Risk Identification, Assessments, and Prediction for Mega Construction Projects: A Risk Prediction Paradigm Based on Cross Analytical-Machine Learning Model)

机译:机器学习的数据详细的研究在学校的土木工程(风险识别、评估和预测大型建设项目:风险预测基于交叉Analytical-Machine范式学习模型)

获取原文
获取原文并翻译 | 示例
           

摘要

2021 MAY 05 (NewsRx) - By a News Reporter-Staff News Editor at Disease Prevention Daily-Investigators publish new report on machine learning. According to news reporting originating from Vellore, India, by NewsRx correspondents, research stated, "Risk identification and management are the two most important parts of construction project management." The news editors obtained a quote from the research from School of Civil Engineering: "Better risk management can help in determining the future consequences, but identifying possible risk factors has a direct and indirect impact on the risk management process. In this paper, a risk prediction system based on a cross analytical-machine learning model was developed for construction megaprojects. A total of 63 risk factors pertaining to the cost, time, quality, and scope of the megaproject and primary data were collected from industry experts on a five-point Likert scale.
机译:2021年5月05 (NewsRx)——由一个新闻记者新闻编辑在疾病预防Daily-Investigators发表新的报告机学习。来自Vellore、印度NewsRx记者,研究说,“识别和风险管理的最重要的两个部分建设项目管理”。编辑引用的研究获得的土木工程学院:“更好的风险管理可以帮助决定未来后果,但识别可能的风险因素有直接或间接的影响风险管理过程。预测系统基于一个十字架analytical-machine学习模型建设大型。因素有关的成本、时间、质量、和范围的超大项目,主要数据收集从行业专家吗五点李克特规模。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号