...
首页> 外文期刊>Highways >New way to lay
【24h】

New way to lay

机译:躺的新方法

获取原文
获取原文并翻译 | 示例

摘要

The project was awarded to Highway Management (Scotland) Ltd - a consortium lead by Bilfinger Berger UK Ltd, John Graham (Dromore) Ltd and Northstone - as a Design, Build, Finance and Operate (DBFO) project thus allowing an innovative and contemporary approach to pavement design based on the principles of performance testing. Bardon Composite Pavements (BCP) were employed to supply, mix and pave 45,000m~3 Cement Bound Granular Material (CBGM) sub base on the (off line) mainline carriageways. BCP were also awarded the contract to paver lay 38,000m~3 Type 1 sub base on side and slip roads.
机译:这个项目被授予公路管理(苏格兰)有限公司——由Bilfinger领导的一个财团伯杰英国有限公司,约翰·格雷厄姆(Dromore)有限公司Northstone——设计、构建、金融和(DBFO)项目这样一个操作创新和当代路面的方法基于性能的原则设计测试。用来供应,混合和45000 m ~ 3水泥铺平道路绑定粒状材料(CBGM)潜艇基地(脱机)主线车道。授予合同摊铺机铺设38000 m ~ 3类型1子基础上,滑的道路。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号