首页> 外文期刊>Highways >Colas plays vital role in Tyne Tunnel construction
【24h】

Colas plays vital role in Tyne Tunnel construction

机译:可乐在泰恩隧道施工中扮演着至关重要的作用

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Road construction has started through the New Tyne Crossing (NTC), with operations for building the carriageway progressing in close coordination with other work in the tunnel. Having made good progress with tunnel construction, the main NTC design and build contractor Bouygues Travaux Publics has awarded a road building and surfacing contract to Colas, which is also now working at a rapid pace.Since award of its contract in December 2009 and after starting work in earnest in January, Colas has completed construction of carriageway up to base course level in the 300m of cut and cover tunnel on the north bank of the Tyne. The contractor is now working in the 1.1km southern approach tunnel, while also building foundations, drainage and pavement of the toll plaza at the northern end of the NTC.
机译:道路建设已经开始通过新泰恩穿越(NTC),为构建操作车道进展密切协调与其他工作的隧道。与隧道施工进展,主要的全国过渡委员会设计和建造承包商Bouygues减速公众已经获得道路建设和浮出水面合同,可乐,现在也在工作快速的步伐。2009年12月后,开始认真工作今年1月,可乐已经建设完成车道基层水平在300米明挖覆盖隧道的北岸泰恩。南部方法隧道,同时建筑基金会、排水和人行道上的损失广场北端的全国过渡委员会。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号