Joint Repair System keeps up cracking pace on the M4/M5

机译:联合修复系统保持破解速度M4 / M5

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Having to integrate with a traffic management schedule in place for the routine maintenance works placed a broad range in output requirements on the joint repair programme, ranging from 400m in one shift that was 'tarmac heavy' to over 2,500m in another shift to make best use of a road closure. "When we saw the programme we had to work with, we could see there were going to be some logistical issues," explains Paul Winter - Operations Director of LMS Highways, "With both high and low output requirements and jobs going ahead over different sections of the network, we could see that we were going to need to utilise both our machine and hand crews effectively."
机译:在交通管理的集成日常维护计划到位产出的作品被广泛需求在联合修复方案,从400米在一个转变是在停机坪上沉重的2500年的另一个转向充分利用公路关闭。,我们可以看到有一些物流问题,”保罗冬天——解释道与运营总监的LMS高速公路。高和低输出需求和就业提前在网络的不同部分,我们可以看到,我们需要利用吗我们的机器和人员有效。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号