...
首页> 外文期刊>World Steel Capacity News >EL HADJAR SETTLES IRON ORE ISSUE THIS TIME AND RESTARTS BF
【24h】

EL HADJAR SETTLES IRON ORE ISSUE THIS TIME AND RESTARTS BF

机译:El Hadjar这次定居铁矿石并重新启动BF

获取原文
获取原文并翻译 | 示例
           

摘要

After the six-day break in BF unit operations due to the lack of iron ore stocks, Algeria’s El Hadjar man- aged to solve the matter and resume production. The company took additional measures to strengthen the raw material supply, hedging the risk of possible interruptions later on. The company restarted its BF on September 8, 2019 after increasing the level of its iron ore stocks. The operations were halted on September 2, Metal Expert reported. “The iron ore stocks of the complex have been increased to a level ensuring the activity of one week pending the resolution of the problem of supplies of raw material,” Algeria Press Service informs, citing the plant’s officials. El Hadjar’s daily iron ore requirement is 8,000 t.
机译:由于缺乏铁矿石库存,阿尔及利亚的埃尔·哈迪哈尔(El Hadjar)曼(El Hadjar)持有解决此事并恢复生产的六天休息后,由于缺乏铁矿石库存。 该公司采取了其他措施来加强原材料供应,以应对以后可能中断的风险。 该公司在提高了铁矿石股票水平后于2019年9月8日重新启动了BF。 据《金属专家》报道,该操作于9月2日停止。 “该综合大楼的铁矿石库存已提高到一个水平,以确保一周的活动,等待解决原材料供应问题,”阿尔及利亚新闻服务(Algeria Press Service)援引该工厂的官员的说法。 El Hadjar的每日铁矿石需求是8,000吨。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号