首页> 外文期刊>Oil Daily >Enbridge Line 3 Faces More Legal Scrutiny
【24h】

Enbridge Line 3 Faces More Legal Scrutiny

机译:Enbridge第3行面临更合法的审查

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Minnesota appeals court judges are weighing whether to uphold a state-level water quality permit for Enbridge’s Line 3 pipeline replacement project, even as the same court prepares to rule later this month on the state’s approval of the project’s route and “need” determination. The water quality challenge is the second pending dispute of state approvals for the project before the appellate court. The court is expected to rule by Jun. 21 on whether the state correctly found that the project is needed, which could potentially have a bigger impact on whether the Line 5 replacement becomes ensnared in further delays.
机译:明尼苏达州上诉法院的法官正在权衡是否支持恩布里奇3号线管道更换项目的州级水质许可证,尽管该法院准备在本月晚些时候对该州批准该项目的路线和“需要”决定做出裁决。水质挑战是上诉法院审理的第二起关于该项目州批准的未决争议。预计法院将在6月21日前就州政府是否正确认定该项目是必要的做出裁决,这可能对5号线的更换是否会进一步延误产生更大的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号