...
首页> 外文期刊>Energy Argus petroleum coke >RefineRy opeRationS Update
【24h】

RefineRy opeRationS Update

机译:炼油厂操作更新

获取原文
获取原文并翻译 | 示例
           

摘要

Extreme cold weather has knocked out about 36pc of the refning capacity in the US Gulf coast, or 20pc of the US total, the US Department of Energy reported. Argus calculates that shutdowns and curtailments have topped 4mn b/d. ExxonMo- bil has shut more than 922,000 b/d of Texas refning capac- ity in Beaumont and Baytown. Saudi Aramco-owned Motiva, operator of the single largest US refning complex, shut its 600,000 b/d Port Arthur facility. LyondellBasell reported an unexpected power loss at its 268,000 b/d refnery in Houston. All 747,000 b/d of refning capacity around Corpus Christi, Texas, reported power disruptions. And Shell reported re- ducing rates at its 225,000 b/d refnery in Norco, Louisiana. Refners demand natural gas for hydrogen and nitrogen in low-sulphur fuel production, for heat and for power. Valero and Marathon Petroleum cited a loss of third-party supplies of such feedstocks.
机译:据美国能源部报道,极端寒冷天气导致美国墨西哥湾沿岸约36%的餐饮业产能下降,占美国总产能的20%。据阿格斯计算,停产和限产已超过400万桶/日。埃克森美孚-比尔公司已在博蒙特和贝敦关闭了超过92.2万桶/日的德克萨斯州refning Capity。沙特阿美拥有美国最大的单一refning综合体的运营商莫蒂瓦(Motiva),关闭了其60万桶/日阿瑟港(Port Arthur)设施。LyondellBasell报告其位于休斯顿的268000 b/d餐厅意外断电。德克萨斯州科珀斯克里斯蒂市的日处理量为74.7万桶的炼油厂均报告电力中断。壳牌公司报告称,其位于路易斯安那州诺科的22.5万桶/日餐厅的餐饮服务价格有所下降。在低硫燃料生产、供热和发电中,Refners需要天然气来生产氢气和氮气。Valero和Marathon Petroleum称,此类原料的第三方供应减少。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号