首页> 外文期刊>International Organization of Scientific Research >Institutional Arrangements and PPP Housing Project Outcomes: Case Study of Sunshine Garden Estate Oba-Ile, Nigeria
【24h】

Institutional Arrangements and PPP Housing Project Outcomes: Case Study of Sunshine Garden Estate Oba-Ile, Nigeria

机译:机构安排和PPP住房项目结果:阳光花园庄园奥维亚,尼日利亚案例研究

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Acute lack of financial resources in Nigeria have compelled governments to implement various public private partnerships (PPP) projects to address current urban housing shortages. Such projects have not always met residents' satisfaction especially in terms of defective construction, with PPP Institutional capabilities emerging as a critical issue. This paper analyses issues of residents' perceptions of the link between institutional arrangements and outcomes of PPP urban housing projects in Nigeria, in the context of the Sunshine Garden Estate (SGE), Oba-Ile, Ondo State. Drawing on both quantitative and qualitative data from a survey of 185 SGE residents, we show that one of the major predictors of residents' resistance toward accepting PPP urban housing stocks was explained by perceptions of deficient institutional arrangements. We further argue that inadequate attention to public consultation, project monitoring and lack of competitive bidding of the Sunshine Garden Estate has compounded the sense that the PPP is another form of privatization in which the provisions of social services and infrastructure is contracted out to private sector organizations. Attention to public consultation, project monitoring and competitive bidding process are vital to avoiding residents' distaste for PPP urban housing stocks and to the successful and ethical implementation of infrastructure projects in Nigeria.
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号