首页> 外文期刊>Argus global LNG >Ferc approves pipeline expansion for Sabine Pass train 5
【24h】

Ferc approves pipeline expansion for Sabine Pass train 5

机译:FERC批准Sabine Pass火车5的管道扩建

获取原文
获取原文并翻译 | 示例
           

摘要

US energy regulator Ferc has authorised midstream operator Kinder Morgan to modify an existing pipeline to send more gas to the Sabine Pass LNG export terminal in southwestern Louisiana by 2019. The $151mn Sabine Pass Expansion Project would install 600,000 dekatherms/ day (dth/d), or about 590mn ft3/d (6.1bn m3/yr), of firm north-to-south capacity on the 135-mile (217km) Kinder Morgan Louisiana pipeline. The project is designed to provide additional gas to Sabine Pass when its fifth liquefaction train comes on line in August 2019. The expansion is due to come into service by 1 April 2019.
机译:None

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号